Exmouth Integrated Artificial reef project – Q3 2018
After decommissioning the Griffin Field, Base Marine’s team of blasting specialists removed all coatings from the MDB’s and modified their weights to ensure level trim and stability. The buoys were modified to optimize their hydrodynamics and asset stabilisation before returning them to water and installed them in the Exmouth gulf along with 49 other purpose-built…