BHP Griffin Field Decommissioning – Q2 2018
In 2018, Fugro released the mid depth buoys (MDB’s) from the seabed of the griffin field. Once on the surface, these were handed over to Base Marine. Base’s scope was to tow the MDB’s to the Exmouth gulf where a purposely designed and installed mooring could receive them. From there the buoys wre rotated, stabilised…